— Track record

Six transactions. On file.

Phase 1 deployments across the Mpumalanga coal complex — from Atlas, our first transaction, through the Kriel corridor enterprise programme, to the Richards Bay logistics deal. Complete deal files available to confirmed recipients under NDA.

Total transactions

6

Exited / completed

4

Ongoing

2

Instruments used

GRR · RBF

Project Atlas — B-grade thermal coal
Surface operations on site — bench preparation under live transmission corridor.

01 · Atlas

Completed

Project Atlas

Phase 1 · Inaugural deployment

Our first transaction. RBF deployed to a junior coal operator running a small opencast pit on a B-grade thermal seam in the Middelburg corridor. Production began on schedule; the deal exited 14 months after entry following operational issues at the mining contractor.

Commodity
B-grade thermal coal
Region
Mpumalanga · Middelburg corridor
Instrument
Revenue-Based Financing
Duration
14 months
Entry
Feb 2019
Exit
Apr 2020
Tonnage
125,000 t produced
Yield
60% of projected production realised
Milestones & challenges
Project Lyra — RB1, RB2, RB3 thermal coal
Force majeure on site — operations team responding to a mechanical and ground-conditions failure that ultimately triggered the pivot to open pit.

02 · Lyra

Completed

Project Lyra

Bord-and-pillar enterprise · Kriel corridor

RBF deployed to an established Kriel-corridor operator running a bord-and-pillar mining enterprise. Production ran at RB1/RB2/RB3 spec for 44 months before a force majeure event forced a relocation of mining activity to the adjacent open pit — see Project Vela.

Commodity
RB1, RB2, RB3 thermal coal
Region
Mpumalanga · Kriel corridor
Instrument
Revenue-Based Financing
Duration
44 months
Entry
Feb 2020
Exit
Oct 2023
Tonnage
1,500,000 t combined with Project Vela
Yield
70% of projected reserve realised
Milestones & challenges
Project Vela — RB1, RB2, RB3 thermal coal
Exposed coal seam on the adjacent open pit — the surface reserve that replaced the underground production base.

03 · Vela

Completed

Project Vela

Open pit pivot · adjacent reserve

When a force majeure event at Project Lyra forced a pivot, the RBF instrument was redeployed against the operator's adjacent open pit reserve. The 2022 production year delivered the highest single-year returns of the Phase 1 portfolio. Exit followed mining-contractor failure in 2023.

Commodity
RB1, RB2, RB3 thermal coal
Region
Mpumalanga · Kriel corridor
Instrument
Revenue-Based Financing
Duration
44 months
Entry
Feb 2020
Exit
Oct 2023
Tonnage
Co-financed with Project Lyra · 1,500,000 t aggregate
Yield
Record annual returns realised in 2022
Milestones & challenges
Highveld Corridor — RB1, RB2, RB3 thermal coal · rail
Loaded wagons at the rail siding — Richards Bay export route.

04 · Highveld Corridor

Exited

Highveld Corridor

Coal export · Richards Bay route

First non-pit transaction. RBF deployed against the rail-logistics leg of a coal export programme — financing siding operations and wagon turnover into the Richards Bay corridor. Exited March 2026 after railing 65% of projected tonnage. Transnet line constraints and equipment theft brought the programme forward from its original Dec 2025 close.

Commodity
RB1, RB2, RB3 thermal coal · rail
Region
Mpumalanga → KwaZulu-Natal · Richards Bay
Instrument
Revenue-Based Financing
Duration
24 months
Entry
Apr 2024
Exit
Mar 2026
Tonnage
200,000 t per annum target railed
Yield
65% of projected volume railed
Milestones & challenges
Project Orion — RB2, RB3 thermal coal
Exploration drilling on the re-entry pit — gridded sampling and dewatering programme in progress.

05 · Orion

Ongoing

Project Orion

Active deployment · Phase 2 onset

RBF deployed against a re-entry opencast cut on a previously abandoned pit. Substantial dewatering programme required before any face exposure. Mining commenced on accessible fringe blocks while dewatering completes on the central reserve.

Commodity
RB2, RB3 thermal coal
Region
Mpumalanga · Kriel corridor
Instrument
Revenue-Based Financing
Duration
25 months projected
Entry
Sept 2024
Exit
Oct 2026 (projected)
Tonnage
1,200,000 t target reserve
Yield
Dewatering 90% complete · fringe-block mining live
Milestones & challenges
Project Cygnus — RB2 thermal coal
Site access and load-out — articulated haul truck staging under operational security.

06 · Cygnus

Ongoing

Project Cygnus

Adjacent pit · staggered deployment with Orion

Sister deployment to Project Orion — staggered entry against an adjacent pit on the same complex. Same dewatering profile; lighter capital quantum reflecting the shorter projected production window.

Commodity
RB2 thermal coal
Region
Mpumalanga · Kriel corridor
Instrument
Revenue-Based Financing
Duration
13 months projected
Entry
Jul 2025
Exit
Aug 2026 (projected)
Tonnage
1,200,000 t target reserve
Yield
Dewatering 90% complete · fringe-block mining live
Milestones & challenges

Counterparty names, colliery names, and pit codes are pseudonymised in line with POPIA. All operational figures are accurate. Complete deal files — including counterparty identities, transaction economics, and IC memoranda — are available to confirmed recipients under NDA via the materials portal.

Engage

Have an asset that fits the record?

Direct engagement with mine owners, permit holders and operators across South Africa and the SADC region.

Transvaal Partners

Operator-led, full-spectrum resource investment across South Africa and the SADC region. Bridging institutional capital and technical operational excellence.

Contact


Important disclosure

Transvaal Partners is not a Financial Services Provider, regulated Fund, or Venture Capital Company under South African law. The Group operates within the parameters of private placement legislation in the Republic of South Africa. The information presented on this website is for general informational purposes only and does not constitute an offer to sell, a solicitation to buy, or a recommendation of any security, financial product, or investment strategy. Engagements are conducted on a private, by-invitation basis with qualified counterparties. Past performance, targeted returns, and forward-looking statements are not a reliable indicator of future results.